The i2 Order Sequencing and Slotting Solution

Resolve problems quickly and provide rapid implementations with reduced time-to-value.

i2 Order Sequencing and Slotting

i2 Order Sequencing and Slotting is designed to enable companies to create a feasible sequence of products, gain global visibility into assembly line constraints with emphasis on the problem areas, and communicate those sequences to the assembly plants/lines. This tool is designed to resolve problems quickly and provide rapid implementations with reduced time-to-value.

Key capabilities of i2 Order Sequencing and Slotting can include:

  • Close coordination with material supply to ensure schedule feasibility and a realistic picture of supply requirements
  • Representation of extensive library of constraints
  • Modeling of constraints at a slot, weekly, or monthly level and any arbitrary bucket level in the sequencing process
  • Modeling of scenarios
  • Manual rescheduling using drag-and-drop method
  • Collaboration with order fulfillment for direct scheduling of production
  • Sequence creation across the final assembly, paint assembly, and body assembly stages
  • Paint/body sequence creation based on final assembly timing restrictions as well as paint/body constraints
  • Ability to perform well in high-volume scheduling environments
  • Rapid replanning—ability to generate sequences based on updated constraints with very little effort
  • Metrics-based sequencing—out-of-the-box reports with sequencing metrics such as batch painting, scatter ratios, and due-date performance

Key benefits of i2 Order Sequencing and Slotting can include:

  • Reduced inventory
  • Improved production efficiency, by taking multiple production constraints into consideration
  • Reduced transportation costs, by limiting the necessity for multiple trips
  • Improved schedule quality
  • Improved margins through improved product mix
  • Improved planner productivity
  • Increased material release stability
  • Increased direct labor productivity
  • Reduced order-to-delivery lead times due to rapid replanning